ARCHORA
Weekly · Mondays

Most project lists arrive after the architect has already chosen.

We send the ones that are still open.

Two minutes, five short parts
01The problem

Product decisions happen early.

By the time a project shows up on a standard list, the architect has been named for months and the specification is written or close to it. Your reps call, and the answer is already decided.

Here is where a list usually reaches you, and where ours does.

Archora sends here
Most lists arrive here
1Concept
2Schematic design
3Design development
4Construction documents
5Bid
6Award
Options open. The firm is named, the spec is not written.
Specification written. Product locked in.
02What arrives

A short list, every Monday.

Projects still in schematic design or early design development. Eight of them, not eight hundred. Each one comes with three things.

  • 01The firm is already named.Who is drawing it, and who at that firm to call.
  • 02A first line for the call.What to say in the first thirty seconds, written for that project.
  • 03The source, so you can check it yourself.The public page it came from, and the date it was last confirmed.
03Where it fits

It sits in front of the lists you already use.

It doesn't replace them. Your sales people reach the firm while options are still open, instead of after the product has been locked in.

04Who it's for

Building manufacturers that want their products considered during design, not just listed after the fact.

05Next step

Want to see what a current list looks like for your product?

Reply or call. I'll send a few projects that fit, and you can judge the calls yourself.

Roger JohnsonArchora